There are lots of updates again since the last time we’ve made the blogpost. The electrical project has been making a very good progress and we are still in the process of completing our conduit and power cable run into the facility. We have made a last minute change in our electrical design and have decided to put in an extra kirk key interlock system that would allow us to have N+N redundancies in our generator design. This has pushed the electrical project a few weeks back for the provisioning and delivery of the kirk key system. Other than that, there has been a very good progress in the electricals. Conduit runs has been put in place, we now have lights!
, power cable are being run inside the conduits, fiber conduits have been completed, ATS, Circuit breaker panels, UPS installation are ongoing, fire supression system installation is almost completed, and we even managed to bolt down a few cabinets!
enjoy the photos!

Electrical Conduits have been installed all over the datacenter floors

PDU installation is ongoing. Conduit has been fed from this PDU to different parts of the datacenter

Can’t wait to juice these circuits up!

Circuit breakers on top of cabinet has been installed and awaiting cable to be fed

Views of conduit being distributed from our PDU

Another Views of conduit being distributed from our PDU

Automatic Transfer Switch power monitor clip.

One of our main electrical panel

Networking Rack has been setup and bolted to the ground. We are expecting to setup our Meet Me Room (MMR) and our Cisco gears in here.

Some cabinets have been bolted down to the ground

:’( Someone vandalize our van parked outside of our datacenter :’(